Iratec provides training, services, inspection, auditing and consulting for the many types of High Rise Building Maintenance Projects.
- Difficult Access- High rise Painting (Example: Maybank HQ)
- Re-lamping beacon light (KLCC)
- Re-installations of beacon lights (KL TOWER),
- Washing of Building facades (Examples: Sheraton, GDC, Public Bank HQ, BSN HQ)
- Building Exterior sealant jobs
- and related High Rise Building Maintenance which required WAH
- Iratec WAH Projects in Malaysia
- Bridge Maintenance – Work at Height
- Maintenance of Silos in TNB Manjung Power Station
- WAH – Building Logo Maintenance, Removal or cleaning of High Rise Signboards
- Inspection Container Crane – North Port Harbour
- Confined Space Rescue – Air Products – Banting
- KL Tower – Re-wiring and replacement of beacon – strobe lights
- KLCC PETRONAS – Sky Scraper – High Rise Tower Maintenance
- WAH on Maxis Telecom Tower
- Project for Maybank
- Painting of high roof structure at STAR station